• About
  • Editorial Board
  • Advertise
  • Join Us
  • Archives
The Wellesley News -
  • News and Features
    • Students Remember the Legacy of Ruth Bader Ginsberg
      Students Remember the Legacy of Ruth Bader Ginsberg
    • First-Year Students Reflect on Their Expectations for College, One Semester In
      First-Year Students Reflect on Their Expectations for College, One Semester In
    • “We Want to Fundamentally Change the Culture,” International Student Union says
      “We Want to Fundamentally Change the Culture,” International Student Union says
    • News
      • News in Brief
      • Nation & World
      • President’s Corner
      • Senate Report
    • Features
      • Alumnae Spotlight
      • Eye on Science
      • Faculty Focus
      • LGBTQIA+ Column
  • Opinions
    • Wellesley, why can’t you meet our dietary needs?
      Wellesley, why can’t you meet our dietary needs?
    • The block system is a joke
      The block system is a joke
    • Spineless nonpartisanship: how the Girl Scouts convinced me they no longer care about girls
      Spineless nonpartisanship: how the Girl Scouts convinced me they no longer care about girls
    • Staff Editorial
    • Letters to the Editor
    • The Elephant in the Room
  • Arts
    • Harry Styles de-typifies masculinity in Vogue’s December Issue, but is this enough? (spoiler: it’s not)
      Harry Styles de-typifies masculinity in Vogue’s December Issue, but is this enough? (spoiler: it’s not)
    • Music Performance Courses Adapt to an Altered Semester
      Music Performance Courses Adapt to an Altered Semester
    • Ben Wheatley’s adaptation of “Rebecca” fails to deliver compared to its classic counterpart
      Ben Wheatley’s adaptation of “Rebecca” fails to deliver compared to its classic counterpart
    • Arts In The News
    • Reviews
    • Music Peek
  • Health and Wellness
    • No image
      Athletic impacts of Covid-19
    • No image
      A new kind of PE
    • No image
      Maintaining wellness as the cold sets in
    • Athlete of the Week
    • Boston Sports Update
    • The Vegan Digest
    • The SHE Corner
  • Miscellanea
    • No image
      Remote students experience existential crises; change class years in email signatures
    • President’s Column: The Butterfly Effect
      President’s Column: The Butterfly Effect
    • Your next on-campus romance isn’t going to work out
      Your next on-campus romance isn’t going to work out
    • The Artichoke
    • The Dose
    • The Olive Branch
    • Multimedia
      • Galleries
      • Infographics
      • Videos
By Rachel Pak News, News and FeaturesSeptember 12, 2014

College completes first phase of renovations in Founders and Green

Field house construction to continue through fall

Founders and Green Hall and continued construction on the Field House over the summer. The Schneider Center, which opened on June 11, is now home to several offices including Student Financial Services, the Registrar and the Class Deans. The renovations come as a part of Campus Renewal, a multi-year renovation and construction project that began in early 2014.

According to The Dirt, a blog that details the progress of Wellesley 2025 projects on campus, work began in the south part of Green Hall and the north part of Founders Hall on June 11. However, in order for construction workers to begin renovating these buildings, some academic departments such as East Asian Languages and Cultures, Spanish and French were displaced for the summer.

Construction workers modernized the classrooms, offices and common spaces on the buildings’ second, third and fourth floors over the course of eight weeks. Renovations also improved accessibility in these buildings by placing a ramp on the second floor and expanding the corridors. In addition to the construction in Founders and Green Hall, workers established a steel frame for the new fitness mezzanine in the Field House on July 23.

According to Pete Zuraw, the assistant vice president of facilities management and planning, construction went smoothly even though some of the projects were large in scale.

“The college had a tremendously successful summer with construction this year,” Zuraw stated.

Zuraw notes that before the completion of these summer projects, the small classrooms and crowded offices made it difficult for the professors of the East Asian Languages and Culture, French and particularly Spanish departments to interact with their students and fellow faculty members.

“The Spanish faculty, who had previously been in windowless office spaces or offices that were so small there was not room to meet with a student, are certainly in a better position to work with their colleagues and students,” said Zuraw.

According to Zuraw, the College hopes that the changes will have a positive effect on students’ academic experience. Because the refurbished Founders and Green Hall and Schneider Center have larger office spaces, classrooms and updated technology, Wellesley faculty members will be better able to serve the student body, even as construction continues through the school year.

“The Campus Renewal program will bring enhancements to the experience of our students, faculty and staff,” Zuraw stated. “The Schneider renovation is already helping to make those student services richer for our students. We will always provide the classes, services and accommodations necessary to run our programs while under construction.”

However, students find that some of these changes are initially inconvenient to navigate. Among other potential problems, Kate O’Hanlon ’15 expressed that because of the renovations to Founders and Green, finding the entrances is an issue.

“I feel like, as someone who gets lost very easily, it may make things harder to find, especially since some of the entrances seem to be closed,” O’Hanlon said.

Amelia Tam ’18 echoes O’Hanlon’s concern.

“I think at first the campus is going to be very disjointed,” Tam said.

In anticipation of the renovations planned for next summer in the Quint, construction workers installed a utility line to provide a dependable source of hot water and steam to the dorms. According to The Dirt, this project, which was completed on August 21 of this year, is essential as the College moves forward with its plans to renovate the dorms in the Quint.

Minor finishing details in Founders and Green will continue into September, and this phase of renovations will close out by December 2014. Although the next phase of renovations has not been finalized yet, more work on Founders and Green Hall is slated to begin next summer.

Throughout the rest of the school year, major construction in Field House will continue and design teams will keep working on plans for Munger Hall, Pendleton West and the Stone Counseling Center.

Share on

  • Facebook
  • Twitter
  • Pinterest
  • Google +
  • LinkedIn
  • Email
Previous articleProfessors’ research on effects of grade deflation reflected in media
Next articlePolice Blotter

You may also like

Students Remember the Legacy of Ruth Bader Ginsberg

First-Year Students Reflect on Their Expectations for College, One Semester In

“We Want to Fundamentally Change the Culture,” International Student Union says

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Email Newsletter

Sign up to receive our weekly digest in your inbox

* indicates required

Top Articles

  • Harry Styles de-typifies masculinity in Vogue’s December Iss...
  • First-Year Students Reflect on Their Expectations for Colleg...
  • Students Remember the Legacy of Ruth Bader Ginsberg

Recent Tweets

Tweets by @Wellesley_News

The independent student newspaper of Wellesley College since 1901.

Sign up to receive our weekly digest in your inbox

* indicates required

  • About
  • Editorial Board
  • Advertise
  • Join Us
  • Archives
COPYRIGHT © 2021 THE WELLESLEY NEWS
Back to top